Sludge Dewatering System Upgrade – Innovative Park, Hong Kong

Project Overview

A leading industrial wastewater treatment facility at Innovative Park, Hong Kong required a robust, automated sludge dewatering solution to handle increased hydraulic and solids loading while meeting stringent environmental discharge requirements.

The scope comprised the supply, installation, and commissioning of a side-bar type automatic membrane filter press, complete with fully integrated ancillary systems for sludge conditioning, polymer preparation, and process control—delivering reliable, round-the-clock dewatering performance.


——

Client Challenge

• Rising sludge volumes from expanded production processes.

• Need to reduce moisture content to minimize off-site disposal costs.

• Compliance with Hong Kong EPD (Environmental Protection Department) standards for dewatered cake solids content.

• Requirement for fully automated operation with remote monitoring capabilities.

• Limited plant footprint—solution had to integrate into existing infrastructure without disrupting operations.


——

Solution Provided

A turnkey sludge dewatering system centered around a side-bar automatic membrane filter press, engineered and installed to the consultant’s exact specifications.

Key Equipment Supplied

• Membrane Filter Press (Side-Bar Type, Automatic)

◦ High-pressure membrane squeeze for superior cake dryness.

◦ Automatic plate shifting, cloth washing, and cake discharge.

• Polymer Preparation Unit (PPU)

◦ Fully automated dry polymer feeding, aging, and dilution.

◦ Consistent flocculant quality for optimized sludge conditioning.

• Sludge Feed Pumps (2 No.)

◦ New centrifugal or progressive cavity pumps sized for design flow and pressure.

• Polymer Dosing Pumps

◦ Precision metering pumps for accurate polymer addition.

• Compressed Air System Interface

◦ Membrane squeeze air supply.

◦ Core blow-down for cake release.

◦ Instrumentation and pneumatic valve actuation.

• Control & Monitoring System

◦ Signal cabling to the central remote control room.

◦ Full automation with HMI interface supporting both automatic and manual modes.

◦ Real-time status monitoring, alarms, and data logging.


——

Design & Operational Highlights

• Daily Operation Capability: Designed for continuous daily throughput aligned with peak sludge generation cycles.

• Sludge Conditioning: Integrated polymer make-up and dosing ensures optimal flocculation before filtration.

• Energy Efficiency: Utilizes existing compressed air infrastructure to reduce auxiliary power demand.

• Automation & Safety: PLC-controlled sequence reduces operator intervention while maintaining safe operating limits.

• Remote Monitoring: Enables plant operators to supervise performance and troubleshoot without being on the equipment floor.

Product guides
Explore our sewage treatment product range

Discover information on equipment specifications and dimensions across our product range. Please contact us for your special needs.

No posts found
Scroll to Top
Any Help?